Customer guide · Company
Subcontract services overview.
Any system, any manufacturer. How we support mainland contractors across Tasmania, from scope to close-out.
Overview
Subcontract services in Tasmania
Securatech supports mainland security and technology contractors with local technicians across Tasmania, from a single site visit to a programmed rollout. Whatever system your contract specifies, we can install, commission and service it. This guide explains what we do, how an engagement runs and what we need from you.
Based in Ulverstone and working statewide, from Hobart to the North West and West Coast.
Designing, installing and supporting electronic security across Tasmania since 2017.
Corporate member of the Australian Security Industry Association, member C11714.
Brand-agnostic. We work to your platform, your design and your standards.
Scope confirmed before attendance. Records, test results and photos returned through your workflow.
Certificates of currency available at securatech.com.au/legal.
Engagement types
Project works
Installation, commissioning and handover for a defined project scope.
Rollouts
Programmed works across multiple Tasmanian sites to a common standard.
Site attendance
Planned maintenance, service calls and fault finding on your behalf.
Upgrades and takeovers
Migrations, integrations and legacy or mixed-brand sites brought up to standard.
Step 1
What we can deliver
Field services for security and technology projects, delivered to your design and standards.
Brand-agnostic delivery
Any system. Any manufacturer.
If a provider or principal specifies it, we can install it. Our technicians work across the major security, communications and network platforms, and pick up unfamiliar or legacy equipment from the manufacturer's documentation and your design.
- Intruder alarms and duress
- Access control and door hardware
- CCTV, video and VMS
- Intercom and door entry
- Nurse call
- Public address and audio
- Structured cabling and fibre
- Networks and wireless links
- Monitoring communicators
- Gate, boom and automation interfaces
- Integration and upgrades
- Legacy and mixed-brand sites
Security system installation
Intrusion detection, duress, sensors and field devices, new or upgrade.
CCTV and video systems
Camera, recorder, network and supporting infrastructure installation, replacement, testing and commissioning.
Doors and credentials
Controllers, readers, locks, door hardware interfaces and expansion works to the nominated design.
Intercom, audio and nurse call
Door entry, PA and background audio, nurse call and associated communications.
Structured cabling and networks
Data cabling, cabinets, wireless links, network hardware, testing, certification and documentation.
Mixed-brand and legacy sites
Interfacing systems, migrating platforms and taking over existing installations.
Step 2
How an engagement runs
Clear coordination and a consistent close-out, so responsibilities are understood before anyone arrives on site.
- 01
Scope review
We review the site, attendance needed, technical scope, the specified platform, programme, access conditions, documentation and principal-contractor requirements.
- 02
Delivery plan
We confirm availability, responsibilities, software or programming access for the specified system, communication pathways and the practical delivery approach.
- 03
Local execution
Our technicians complete the agreed works and keep your nominated project contact informed.
- 04
Close-out
Completion records, test results, photographs, defects and agreed documentation are returned through your workflow.
Lodge work online
securatech.com.au/subcontractor-work-request
Send the site, scope and attachments through our subcontractor work request form, and we will confirm the pathway.
Step 3
What we need from you
The more of this we have up front, the faster and cleaner the attendance.
With the work request
- Site address, access hours and site contact
- Scope of works, drawings and equipment list
- System make and model, and any existing site files
- Programme or target dates
- Your documentation and close-out requirements
- Principal-contractor induction and safety requirements
- Purchase order or approval process
What you receive
- Confirmation of scope, responsibilities and attendance
- Updates to your nominated contact during works
- Test results and commissioning records
- Photographs of completed work
- A defects list where anything is outstanding
- Updated programming and as-built information
- Documentation in the format you require
Next steps
Send us the scope
Rates and a capability schedule are available on request.
Request information
Ask for our rates and capability schedule, or a call to discuss an upcoming project.
Lodge a work request
Use the subcontractor work request form to send a specific job with attachments.
Check our documents
Insurance certificates, trading terms and safety systems are at securatech.com.au/legal.
Open an account
Apply for a trading account at securatech.com.au/account-application.
Read more on the official sites
Each engagement is subject to an agreed scope, our Terms of Trading and Service Terms. After-hours works by agreement. This guide is general information.
Plan it before we talk.
Take it with you
Keep the full guide for your site walk.
The PDF includes worksheets to fill in before we visit.